Engineered Access & Structural Upgrades
- Tiered stairway configuration with integrated mid-level landing for safe operator movement
- Custom steel sleeves reinforcing existing concrete footings, preserving structural integrity
Brenntag Canada undertook a comprehensive upgrade of an existing propane railcar unloading facility at their Ajax location. The project required full removal and replacement of an aging unloading system while maintaining safety, compliance, and operational efficiency within a highly constrained industrial site.
The facility presented multiple engineering challenges, including limited working space due to dense piping infrastructure and deteriorating concrete foundations supporting the original platform.
Mitigate fall hazards during elevated propane railcar unloading operations.
Enable safe, efficient operator access within a compact, constrained unloading area.
Meet regulatory requirements for fall protection and pressurized gas handling.
Designed for safety, operational performance, and compliance.
Engineered Access & Structural Upgrades
Equipment Supply & Integration
Site-specific engineering, access layout development, and structural detailing tailored to severe space and infrastructure constraints.
Complete demolition and installation executed within a confined operating environment while coordinating closely with existing site utilities.
Fall protection, access systems, and transfer equipment installed to meet applicable propane handling and rail unloading safety standards.
Final system verification and turnover completed with all components integrated into a unified, ready-for-operation unloading facility.